Drainage Supplies Options
The five" Pro Sequence Channel Drain really should be mounted at least one/four" under the finished quality with the bordering floor. Connect the essential variety of channel sections alongside one another applying interlocking conclusion connections. Place the grates about the channel and screw set up. Install close caps at the end of the runs as